![]() ![]() The Contractor will maintain a drawing card file or computer database to log changes (revisions) to the contract drawings. ![]() From this set, the general Contractor shall detach and furnish, at no charge to the Mechanical and Electrical Subcontractors the drawings of their portion of the Work for the same purpose.The general Contractor shall reserve A copy of complete set of the approved final contract drawings is to be utilized as the base sheets for the as-built & record drawings.PROCEDURES & RESPONSIBILITIES FOR “AS-BUILT” DRAWINGSġ- PROCEDURES & RESPONSABILITIES DURING CONSTRUCTION The contract requires the Systems Contractor to prepare, maintain and deliver to the consultant a set of redlined, AS-built drawings, which show the actual as-built conditions of the construction phases. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |